South Patrick Shores is a residential stretch of the barrier island in the South Beaches, just south of Patrick Space Force Base. The homes here are mostly older single-story houses, and their driveways, walks and patios have had years of sun, salt air and summer storms on them, so the calls we get are usually about cracked, sunken or chipping concrete. We do the same work down the island in Satellite Beach and over on the mainland in Rockledge.
The ground and the water shape the job here more than anything else. Flooding comes from short, heavy rains and from tidal surges when coastal storms and hurricanes come through, with the Atlantic on one side and the Indian River Lagoon on the other, so on a sandy island lot, where your water goes matters as much as the concrete itself.
What sets your price and schedule
The size of the slab, how thick it needs to be, whether we're tearing out old concrete first and how far we have to wheel material from the street all move the price. A plain broom finish, a light scratched texture that gives your feet and tires grip when it's wet, costs less than stamped or decorative work. The schedule mostly turns on the weather and on curing, the days the concrete needs to gain strength before you load it, so you'll stay off a new patio for a few days and keep the car off a driveway longer. We come out to look at the job, and that's where you get your own number.
Why we spend more on the base
The base is the subgrade, the dirt and fill your slab sits on, and on sandy ground it's where most failures start. We dig it out, pack it and set the grade so water runs away from your house, not toward it, because a slab raked level over loose sand settles as the sand moves. Nobody sees the base once we pour, so it's the first thing a tight budget wants to cut, and it's the last thing we'll cut. We also saw control joints, straight grooves that give the concrete a planned place to crack, early enough that the hairline cracks most concrete gets land in the joints instead of across your driveway.
Fixing part of a driveway, or adding on
When only part of your driveway is cracked, sunken or chipping, we can cut out and replace just those sections so you don't pay for a whole new one. We start early on hot days, because concrete poured in the midday sun can dry too fast on top and turn weak and dusty later. If you're planning something bigger, like a new slab for an addition or a carport, that starts below the surface with concrete footings sized for the load. Either way, we finish with clean, straight edges, because that's what you see every time you pull in.





